Beachgrove Information
Information and Guidelines
-
At Beachgrove the design and landscaping of each lot requires approval from the Developer or the Developer’s agent prior to the commencement of any building works or landscaping.
-
Land Covenants for Beachgrove, Kaiapoi.
-
As you may be aware, a sewer pump system is to be installed as part of the building works on all lots within the Beachgrove Subdivision. This sewer pump system will discharge wastewater into a pipe in the street and the onto the council sewer network. The purpose of this document is to provide the homeowners and/or building companies with information on the sewer pump system.
-
Beachgrove Subdivision, Kaiapoi, Scala Penetrometer Testing Stage 5A-B.
This document presents the results of the bearing capacity tests undertaken by Tonkin & Taylor Ltd (T+T) on the engineered hard fill prepared for Stage 5A-B lots 215 to 220, 226 to 228, 234 to 240, 254 to 267, 285 to 302, 387 and 388, Beachgrove subdivision, Beach Road, Kaiapoi.
-
Download approved fencing typologies for Beachgrove, Kaiapoi.
-
Copy of the Amended Decision reached by the Officer under delegated authority from the Council on the above application.
-
Beach Grove Subdivision, Kaiapoi Scala penetrometer testing Stage 5C-D
-
Stage 6A bearing capacity report for lots 307 to 335 and 336 to 340.
-
Waimakariri District Council - Subdivision Listing for stage 5AB & 5CD
-
Stage 5 and 6 street co-ordination plan (updated 13 Feb 2024)
Masterplan
View the interactive Masterplan to see all that is on offer at Beachgrove.
FAQ
Information for property buyers and residents